Minutes of
the E163 Civil Construction Meeting, 3/31/04.
Attendees: E. Colby, H.
Shin, P. Rodriguez, D. Palmer, R. Noble, S. Pierson, R. Siemann,
C. Corvin
1. Discussion started with
Sandy Pierson regarding the proposed move of Bldg. 225 to a location NE of ESB
to become the E163 control room.
Following the meeting Hieu Dao of SEM assigned Harry Shin as the UTR for the
building move.
2. R. Siemann
reported that the B225 electrical system is up to code.
Afer the meeting it was
confirmed that B225 has fire sprinklers.
The new foundation would be
the same design as for buildings previously moved, and after the meeting Ken
Yang of SEM reported that no Earthquake Safety Committe
review of the foundation was needed.
R. Noble will check with
Stan Mao of Rad Physics if any RP approval is needed
to move B225 since its new location will be between the FFTB and ESB.
3. The plan is to place B225
within 8 to 12 feet of northern wall of ESB, over the utility trench. S.
Pierson will check on minimum separation required for traffic/fire access and
also check with Rob Reek whether the fire hydrant can be moved or even taken
out so B225 could be placed further west. Stored equipment, beam stops, blocks,
etc presently stored in the area will be moved by
4. H. Shin reported that the
final layout drawings for the laser clean room bid package have been put into
Document Control by R. Principe.
The clean room technical
spec has been signed by all except Jack Fry who must aprove
it for ESH compliance prior to going to bid. Goal is to submit the bid package
to Mimi Chang on Monday April 5 to start the procurement process.
Additional information about
the E163 experiment can be found at:
http://www-project.slac.stanford.edu/e163/
Meeting minutes posted at:
http://www-project.slac.stanford.edu/e163/MeetingMinutes/default.htm
*******************************************************