Minutes of
the E163 Civil Construction Meeting, 3/17/04.
Attendees: E. Colby, R.
Principe, H. Shin, C. Corvin, D. Palmer, R. Noble, D.
Amador, R. Siemann, D. Walz
1. The two drawings
coordinated by R. Principe in support of the laser room bid package were
reviewed. The two drawings contain a general layout of the room with the
electrical single line diagram, and an electrical panel schedule.
It was decided to omit the
original laser room utility worksheet that dilineated
the actual laser equipment as this would not be useful to the vendor.
2. It was decided that all
doors of the laser room will open outward.
The future clean power
connection to the mezzanine will be made via an independent conduit run from
the E163 J-box on the ESB north wall rather than through a connection in the
laser room.
3. The laser room bid
package being assembled by H. Shin was reviewed.
It was decided to ask for a
performance period of 90 days in the spec without specifying the end of fiscal
year boundary. It was also decided that all electrical conduits for the laser
room can be standard EMT type. Other changes to the spec would be collected
between Colby, Noble, and Palmer and submitted to Shin on Thursday morning
3/18.
4. Goal is to complete the
final bid package for the laser room by Friday 3/19.
Additional information about
the E163 experiment can be found at:
http://www-project.slac.stanford.edu/e163/
Meeting minutes posted at:
http://www-project.slac.stanford.edu/e163/MeetingMinutes/default.htm