NLC Timing System Notes, presentations

 

Presentation from 11/5/99 Talk.pdf      Talk.fm

Test system software requirements (tentative)

Power Point presentaton on system (draft) talk.ppt

CD1 dry run presentation CD1talk.ppt

Timing System R+D schedule timing.mpp

Timing System ToDo list

Notes and to do list Oct 27 1999

Notes and to do list Nov_3_1999

Notes and to do list Nov_10_1999

Notes and to do list Mar_22_2000

Notes and to do list July 19 2000 

Notes and to do list 10_25_2000 

Notes and to do list 1_10_2001 

Notes and to do list 3_7_2001 

Noteas and to do list 3_14_2001

Radiation effects in fibers Radiation

Sector Phase Reference note: Sector_Phase_Reference.pdf Sector_Phase_Reference.fm

Phase noise estimates for the local oscillators phase_noise.pdf

Control System Interface for timing system interface.pdf interface.fm

CD0.4Costing Information costs.pdf costs.xls

Page by Josef Frisch frisch@slac.stanford.edu 04/22/2002