NLC Timing System Notes, presentations
Presentation from 11/5/99 Talk.pdf Talk.fm
Test system software requirements (tentative)
Power Point presentaton on system (draft) talk.ppt
CD1 dry run presentation CD1talk.ppt
Timing System R+D schedule timing.mpp
Notes and to do list Oct 27 1999
Notes and to do list Nov_3_1999
Notes and to do list Nov_10_1999
Notes and to do list Mar_22_2000
Notes and to do list July 19 2000
Notes and to do list 10_25_2000
Notes and to do list 1_10_2001
Notes and to do list 3_7_2001
Noteas and to do list 3_14_2001
Radiation effects in fibers Radiation
Sector Phase Reference note: Sector_Phase_Reference.pdf Sector_Phase_Reference.fm
Phase noise estimates for the local oscillators phase_noise.pdf
Control System Interface for timing system interface.pdf interface.fm
CD0.4Costing Information costs.pdf costs.xls
Page by Josef Frisch frisch@slac.stanford.edu 04/22/2002