WBS Element: RF Sys Activities - ML 500          WBS Code: 1142211
Responsible Person(s): Neubauer
Date: 990222 Revision: 2

WBS Element Definition:

WBS 1142211 RF Sys Activities - ML 500 covers the ED&I for the various systems in the Main Linac.  500 FTE years are covered.  some of their activities are:
 

ED&I Tasks(Engineers, Techs, Designers) ongoing

Prepare First Complete Drawing/Document Package

Review Specifications with Suppliers

Concurrent Engineering

Product Engineering

Design For Manufacturing

Independent Verification and Valuation of Procedures

Develop Measurable Acceptance Criteria

Engineering interface to ISO9000

Value Engineering Teams

Value Management

Engineering interface to Quality Review Board

Develop Inspection Criteria

Develop Internal and External Procedures

Internal Design Review

Test and Evaluation plans

Test Procedures

Develop and Maintain Bill of Materials

Ongoing Risk Analysis

Documentation of Inspection Results

Evaluation of Inspection Results

Maintain Documentation

Verification of Inspection Results

 

Conceptual Specification (or Drawing) for Planning Purposes Only

Not for Engineering Release