1.3 |
MAIN LINAC SYSTEMS ($000) |
|||||||||||
1.3.1 |
Main Linac Systems Engineering |
|||||||||||
1.3.1.1 |
System Engineering & Administration (CD1-CD4) |
|||||||||||
Labor (hrs) |
Labor ($) |
$27,963 | Material $ |
|||||||||
1.3.2 |
Main Linac Beam Lines |
|||||||||||
1.3.2.1 |
Conceptual Design (CD1-CD2) |
|||||||||||
Labor (hrs) |
Labor ($) |
Material $ |
||||||||||
1.3.2.2 |
R&D (CD1-CD4) |
|||||||||||
R&D Structure |
||||||||||||
Labor (hrs) |
Labor ($) |
Material $ |
||||||||||
R&D Magnet Systems |
||||||||||||
Labor (hrs) |
Labor ($) |
Material $ |
||||||||||
1.3.2.3 |
Design (CD2-CD3)(Title I and Title II) |
|||||||||||
Labor (hrs) |
Labor ($) |
Material $ |
||||||||||
1.3.2.4 |
Sustaining Engineering (CD3-CD4) |
|||||||||||
Labor (hrs) |
Labor ($) |
Material $ |
||||||||||
1.3.2.5 |
Acquisition (CD3-CD4) |
|||||||||||
Acquisition Magnet Assembly (including BPM, movers,supports, and cables) |
||||||||||||
Labor (hrs) |
Labor ($) |
Material $ |
||||||||||
Acquisition Structures on a Girder (girder, support structure cables) |
||||||||||||
Labor (hrs) |
Labor ($) |
Material $ |
||||||||||
Acquisition Vacuum systems (pumps, cables, power supplies, non-RF sectors) |
||||||||||||
Labor (hrs) |
Labor ($) |
Material $ |
||||||||||
Acquisition Diagnostic Regions |
||||||||||||
Labor (hrs) |
Labor ($) |
Material $ |
||||||||||
1.3.3 |
Main Linac RF Systems |
|||||||||||
1.3.3.1 |
Conceptual Design (CD1-CD2) |
|||||||||||
Labor (hrs) |
Labor ($) |
Material $ |
||||||||||
1.3.3.2 |
R&D (CD1-CD4) |
|||||||||||
R&D Klystrons |
||||||||||||
Labor (hrs) |
Labor ($) |
Material $ |
||||||||||
R&D LLRF |
||||||||||||
Labor (hrs) |
Labor ($) |
Material $ |
||||||||||
R&D Modulator |
||||||||||||
Labor (hrs) |
Labor ($) |
Material $ |
||||||||||
R&D DLDS |
||||||||||||
Labor (hrs) |
Labor ($) |
Material $ |
||||||||||
1.3.3.3 |
Design (CD2-CD3)(Title I and Title II) |
|||||||||||
Labor (hrs) |
Labor ($) |
Material $ |
||||||||||
1.3.3.4 |
Sustaining Engineering (CD3-CD4) |
|||||||||||
Labor (hrs) |
Labor ($) |
Material $ |
||||||||||
1.3.3.5 |
Acquisition (CD3-CD4) |
|||||||||||
Acquisition Klystron two-packs (with TWT drivers) |
||||||||||||
Labor (hrs) |
Labor ($) |
Material $ |
||||||||||
Acquisition LLRF (and cables?) |
||||||||||||
Labor (hrs) |
0 |
Labor ($) |
$ - |
Material $ |
||||||||
Acquisition DLDS systems (vacuum roughing system, pumps, cables) |
||||||||||||
Labor (hrs) |
Labor ($) |
$ - |
Material $ |
|||||||||
Acquistion Modulator (MKSU and controls) |
||||||||||||
Labor (hrs) |
0 |
Labor ($) |
$ - |
Material $ |
||||||||
1.3.4 |
Main Linac Installation, Integration & Testing |
|||||||||||
1.3.4.1 |
Installation, Integration & Testing (CD1-CD4) |
|||||||||||
Labor (hrs) |
254,708 |
Labor ($) |
$14,009 |
Material $ |
$126,081 |
|||||||
1.3.5 |
Main Linac Systems Integration Test |
|||||||||||
1.3.5.1 |
MLSITF (CD1-CD4) |
|||||||||||
Labor (hrs) |
Labor ($) |
Material $ |
$ 50,000 |
|||||||||
2,618,251 |
$134,619 |
$848,873 |
$983,522 |
|||||||||