|
1.3.3 |
Main Linac RF Systems |
($000) |
|||
|
1.3.3.2 |
R&D (CD1-CD4) |
||||
|
Labor Hours |
Labor $ |
Material $ |
totals |
||
|
Klystrons |
$ 18,280 |
||||
|
Modulators |
$ 899 |
||||
|
LLRF |
$ 1,140 |
||||
|
DLDS |
$ 4,754 |
||||
|
Total |
191,585 |
$ 10,422 |
$ 14,650 |
$ 25,072 |
|
|
Klystrons |
|||||
|
Klystrons |
136,900 |
$ 7,530 |
$ 10,750 |
JCC |
|
|
Klystron Drivers and Misc |
|
DLDS |
|||||
|
DLDS System |
24,000 |
$ 1,320 |
$3,000 |
MN |
|
|
Gallery Vacuum Costs |
7,891 |
$ 434 |
JW |
||
|
Vacuum |