|
|
Next
Linear Collider 
Damping Ring
Physics
|
April 22, 2002
NLC Technical Page
Meeting
Schedule
SLAC Home Page
Link to all meeting
notes (ordered by date, filenames are a bit arbitrary)
Topics:
Technical and Cost reviews -
2000
CD-1
Reviews and related planning - 3/18/98, 6/25-26/98, 11/4-5/98, 5/24-28/99
Collective Effects
- CDR0.4 Requirements/specifications (McKee) 4-00
- Injector
Complex Instrumentation - CD-1 document by M. Ross 2-22-99
- drrf_mm.pdf - M. Minty, 6/3/98, study of tolerances for the
proposed high duty-cycle using feed-forward, energy aperature for coherent beam
oscillations, etc.
- Tor's
ZDR meeting notes.html
- 4-22-98
DR R&D Topics.pdf - P. Krejcik 4/22/98, discussion of prototype and r&d items
for the NLC damping ring, working backwards from 2004.
- March_11_1998_Notes.pdf
- McKee 3/11/98, review of modeling process and component count methods, lists of items
and an early pass at component costing.
- Tor_Review_030498.pdf
- Tor 3/4/98, review of the ZDR damping ring effort (with names), list of expected
changes, and an annotated/updated set of parameter sheets and sketches.
Technical Systems
Engineering Team Reports
Topic list
Wiggler
Power Conversion
Topic list
Links to: the NLC Home Page, the SLAC and KEK
Institutional Home Pages.
Page credits and comments.