text only 

2003  Configuration Documentation

                                          (2001 Configuration)

Overview

Injector Systems Main Linac Beam Delivery

 

NLC 2003 BDIR Configuration

  • Collimation Systems
  • Low E Big Bend
  • Final Focus Systems
  • Interaction Region
  • Extraction Lines
Conventional Facilities Technical Systems Electrical Systems
  • CF CA-IL NC/SC Graphics - pdf, pdf
  • CF CA NC Design Summary - pdf
  • CF CA SC Design Summary - pdf
  • CF CA-IL NC/SC Tunnel Cost - pdf   
  • CF CA-IL NC/SC IR Hall Cost - pdf 
  • CF NC-SC Schedule - pdf, pdf
  • CF NC-SC TBM-Deployment - pdf
  • CF NC-SC Same Site Footprint - pdf
  • CF NC-SC Tunnel Safety - pdf
  • CF Design Summary Web

 

 

  • Magnet Systems - doc, pdf
  • Vacuum Systems - doc, pdf
  • Dumps & Collimators - doc, pdf
  • Movers & Supports Systems - doc, pdf
  • Manufacturing Facilities - doc, pdf
  • Installation - doc, pdf
Klystron Modulators

Global Systems

  • Controls
  • Protection 
    • Personnel (PPS)
    • Beam Containment (BCS)
    • Machine (MPS)
  • Timing
  • Racks and Cable Plant

Instrumentation Parameters

R&D Descriptions

  • Tunnel Electronics Enclosures

  • Low Level RF

  • Beam Monitors

    • Quad Beam Position (QBPM)
    • Multibunch Beam Position (MBBPM)
    • Damping Ring Beam Position (DRBPM)
    • Structure Phase / Position (SPM)
  • Movers
  • Vacuum
  • DC Magnets