At the request of the International Technical Recommendation Panel, the GLC/NLC collaboration prepared thirteen progress descriptions for the two TRC R1's and the eleven TRC R2's that applied to the GLC/NLC X-band linear collider design.
| R1-1 | Gradient | Done | Completed 6 of the 13 TRC R1 and R2 items identified for the X-band design with expectations of completing 4 to 5 more in 2004 |
| R1-2 | SLED-II | Done | |
| R2-1 | Klystron | Done | |
| R2-2 | RF Unit | Completion expected in 2004 | |
| R2-3 | E-cloud | Active program with demonstration planned in 2006 | |
| R2-4 | Ions | Active program with benchmarks planned in 2004 | |
| R2-5 | DR kicker | Done | |
| R2-6 | DR emittance | Done | ATF & ALS results better than simulation! |
| R2-7 | LET tuning | Active program with results expected in 2004 | |
| R2-8 | Instrumentation | Active program with many elements done | |
| R2-9 | Linac Vibration | Active program with demonstration planned in 2005 | |
| R2-10 | Availability | Done | 1st pass with important conclusions |
| R2-11 | LET tuning | Active program with results expected in 2004 |