Updates on the TRC R1 and R2 items

January 20, 2004

At the request of the International Technical Recommendation Panel, the GLC/NLC collaboration prepared thirteen progress descriptions for the two TRC R1's and the eleven TRC R2's that applied to the GLC/NLC X-band linear collider design.


R1-1 Gradient Done Completed 6 of the 13 TRC R1 and R2 items identified for the  X-band design with expectations of completing 4 to 5 more in 2004
R1-2 SLED-II Done  
R2-1 Klystron Done  
R2-2 RF Unit   Completion expected in 2004
R2-3 E-cloud   Active program with demonstration planned in 2006
R2-4 Ions   Active program with benchmarks planned in 2004
R2-5 DR kicker Done
R2-6 DR emittance Done ATF & ALS results better than simulation!
R2-7 LET tuning   Active program with results expected in 2004
R2-8 Instrumentation   Active program with many elements done
R2-9 Linac Vibration   Active program with demonstration planned in 2005
R2-10 Availability Done 1st pass with important conclusions
R2-11 LET tuning   Active program with results expected in 2004

 

 