Next Linear Collider
|
|
R. Larsen - January 8, 1999 |
||
| MODULATOR 2-PACK TANK | ||
| THE KLYSTRON Group working on the BASELINE MODULATOR 2-PACK DESIGN will review the detailed design of an OIL-FILLED TANK to hold the modulator POWER TRAIN AND TWO 75 MW KLYSTRON SOCKETS. The unit will be built and tested in FY99 on a test stand and will serve as a test bed for future tube testing. | ||
| THE REVIEW WILL COVER: | ||
|
||
| MECHANICAL DESIGN | ||
| ELECTRICAL DESIGN | ||
| OIL SYSTEM | ||
| CONTAINMENT | ||
| COOLING ISSUES | ||
| COST ANALYSIS | ||
| DOCUMENTATION STATUS | ||
| PROTOTYPE PRODUCTION READINESS | ||
| PROPOSED SCHEDULE | ||
This page created and updated on 1/5/99 by Nixx.