Modulator Tank Design Review
Bdlg.214, Fuji Conference Rm. @ 1:30 PM

R. Larsen - January 8, 1999

MODULATOR 2-PACK TANK
THE KLYSTRON Group working on the  BASELINE MODULATOR 2-PACK DESIGN will review the detailed design of an  OIL-FILLED TANK to hold the modulator POWER TRAIN AND TWO 75 MW KLYSTRON SOCKETS. The unit will be built and tested in  FY99 on a test stand and will serve as a test bed for future tube testing.
THE REVIEW WILL COVER:
  • MECHANICAL DESIGN
  • ELECTRICAL DESIGN
  • OIL SYSTEM
  • CONTAINMENT
  • COOLING ISSUES
  • COST ANALYSIS
  • DOCUMENTATION STATUS
  • PROTOTYPE PRODUCTION READINESS
  • PROPOSED SCHEDULE
MECHANICAL DESIGN
  •  
ELECTRICAL DESIGN
  •  
OIL SYSTEM
  •  
CONTAINMENT
  •  
COOLING ISSUES
  •  
COST ANALYSIS
  •  
DOCUMENTATION STATUS
  •  
PROTOTYPE PRODUCTION READINESS
  •  
PROPOSED SCHEDULE
  •  