|
CD-1 Progress ReviewNovember 4, 1998 |
Injector Systems: Damping Ring
- Introduction Systems - J. Sheppard
- WBS - K. Millage
NLC Sources
- Overview of Layout & Technical Issues - D. Schultz
- PPRC R&D Plans 1999-2000, PPRC - G. Mulhollan
- Multibunch Design -T. Kotseroglou
- Laser Design & Challenges - J. Frisch
- Positron Target Issues - A. Kulikov
- Polarized Positron Plans - T. Kotseroglou
- Summary - D. Schultz
L & S
- Overview - J. Sheppard
- Mechanical - C. Rago
- Tolerances - Z. Li
- Risk Analysis - J. Sheppard
Main Linac
- Overview, Linac Design & R&D Program - C. Adolphsen
- Overview of Costing Plans - M. Neubauer
- Baseline Modulator Design and R&D - S. Gold
- Induction Modulator Design and R&D - R. Cassel
- Modulator Cost & Scheduling Model - R. Larsen
- Klystron Development Programs - E. Jongeward
- Klystron Cost & Scheduling - J. Cornuelle
Beam Delivery: Interaction Region
- Overview - T. Markiewicz
Collimation System
- Design Constraints - T. Raubenheimer
- Wakefield Tests - P. Tenenbaum
- Novel Collimator Design & Material Survival Tests - J. Frisch
Tuning Strategy & Diagnotic Instrumentation
- Design Constraints - P. Tenenbaum
Dump Line
- Design Constraints - Y. Nosochkov
Engineering Status
- Magnet System - A. Ringwall
- Vacuum System, Facilities & Costing Overview - L. Eriksson
- Crab Cavity RF System - J. Frisch
- Beam Dump - D. Walz
Controls
- Introduction - R. Larsen
- Timing - J. Frisch
- BPM's - S. Smith
- LLRF - H. Schwarz / P. Corredoura
- Architecture - S. Clark
Conventional Facilities
- Overview of Conventional Facilities - J. Ives
- Site Selection Process - J. Ives
- Status of Definition, of Requiements I - C. Corvin
- Status of Definition, of Requiements II - J. Sevilla
- Status of Risk & Contingency Analysis - C. Corvin
Project Managment & Engineering
- NLC Strategic Plan - D. Burke
Project Data Managment
- PDMI: Project Communication Development - A. Larsen
- PDMII: WBS Development - T. Lavine
- PDMIII: Intergrated Cost, Schedule Development - J. Chan
- PDMIV: PDM System Development - Z. Wilson
- PDMV: Main Linac Cost & Scheduling Development - M. Neubauer
Reliability Engineering
- Reliability Engineering Methodology - Z. Wilson
- Reliability Engineering Examples: DC Magnet System - C. Rago
This page created and updated on 11/4/98 by Nixx.
Links to: the NLC Home Page, the SLAC and KEK Institutional Home Pages.