Vibration,
Ground Motion, and Site Requirements |
Overall
Agenda
Tentative
agenda of this WG:
Tuesday
May 7th afternoon
"Natural ground
motion and remote noises"
(jointly with CF WG and with Underground Advisory Board)
- Update on CA NLC site development status,
drilling and geo-enviro progress, w/preliminary design progress. Plans for
FY '02-'03.
Clay Corvin,
~30 min
- Plans and results of ground motion measurements
for sites characterization studies, slow motion measurements with HLS
systems at SLAC, MI8, Aurora mine -- FNAL and SLAC parts
S.Singatulin,
A.Erokhin (BINP), V.S. , A.S. ~30+30min
- Proposal to make two tunnel vibration
study
Fred Asiri,
~30min
- Planning for vibration studies in NUMI tunnel
(noise versus depth)
M.Velasco (NWU),
C.Laughton, et al., ~30min
- Discussion
Wednesday
May 8th morning
"Local noises,
counteraction, stabilization"
- Plans and results for linac girder stability
study at FNAL
Harry
Carter ~30min
- Results of measurements of RF structure and EM
quad vibrations caused by cooling water
Frederic Le
Pimpec, ~30min
- Vibration and stability issues in normal and
superconducting quads (final quad and linac quads) -- general
discussion
Colleagues
from Magnet WG and Brett Parker (BNL) are cordially invited ~30min
- Proposal for the IP prototype R&D (includes
stabilization, assembly, instrumentation, interface to detector, and other
issues)
Tom
Markiewicz, ~30min
- Vibration of Tev elements
Todd
Johnson, ~20min
- Tevatron beam motion measurements
XL Zhang,
~20min
- Discussion
Wednesday
May 8th
afternoon
Summary talks
Summary of working group
on ground motion
A. Seryi
NLC Technical Page
Meeting
Schedule
SLAC Home Page
This page created on 04/17/2002
by Nixx
and updated on May 20, 2002 by A.S.