 |
Structures
and High Gradient Studies
|
- Tuesday afternoon, May 7 - Structures and High Gradient Studies
- (1:00 to 5:00, Wilson Hall
1st Floor East)
Break
- S. Tantawi: Results from waveguide breakdown
studies at ASTA.
- J. Wang: New structure coupler designs and
future structures.
- S. Geer: NCRF R&D at Lab G.
- Informal tour of Lab G RF Test Facility for those
interested
- Wednesday Morning, May 8 - Joint Session with the Pulsed Power Group.
- (8:30
to 12:00, Wilson Hall 2nd Floor Northeast (Snakepit)
- All: Discuss NLCTA installation issues for the
8-Pack structures - FNAL will present a preliminary girder layout based on
the H60VG3 design.
Break
- All: Discuss 'Care and Feeding of High Power
RF' for the X-band power station being planned at FNAL that uses XL4
klystrons and an NLCTA like modulator. Discussion topics will include the
lessons learned from X-band power source operation at NLCTA.
- Wednesday Morning, May 8 - RF Component Design and QC.
- (8:30
to 12:00, TD Industrial Building 2nd Floor Conf. Rm.)
- C. Nantista: Recent structure coupler matching
studies at SLAC.
- Ivan Gonin: Coupler optimization for FXA sructure.
- Gennady Romanov: Overview of RF structure measurements
at Fermilab
- C. Nantista: 8-Pack Phase I component designs
Speakers should plan 25 minute
presentations - 5 minutes will be allotted for questions after each talk. Please
email Chris Adolphsen any additions
and/or corrections.
NLC Technical Page
Meeting
Schedule
SLAC Home Page
This page created on 04/17/2002 and updated on May 05, 2002 by Nixx.
[Disclaimers, Copyright, and
Other Fine Print]