8 pack meeting notes September 4th 2001
1)
Schedule &
Budget Continuing from last week, Klystron, SLED/DLDS/Loads, M&K controls,
PPS, Cabling
2)
Updated floor
plan in ESB
3)
Areas of
responsibility, and eliminating gaps in responsibilities between groups
1) Floor Plan
a. Will have meeting at End Station B (ESB) at 14:00 to discuss layout. Preliminary layout was shown
b. Questions
i. What will the cable path be?
ii. Where will the oil tank go?
iii. Walkway between 4-Pack and 8-Pack modulators? 5 feet is first guess.
iv. How thick is the floor in ESB? L. Erickson
c. Need to verify ESB drawing. M. Ofengender
2) Responsibilities and Gaps
a. Should post McKees requirements chart on web.
b. Bring requirements and specification questions for next meeting.
c. Bring a list of you long lead items for next meeting.