8 pack meeting notes – September 4th 2001

 

Agenda:

1)     Schedule & Budget Continuing from last week, Klystron, SLED/DLDS/Loads, M&K controls, PPS, Cabling

2)     Updated floor plan in ESB

3)     Areas of responsibility, and eliminating gaps in responsibilities between groups

 

Notes:

1)     Floor Plan

a.      Will have meeting at End Station B (ESB) at 14:00 to discuss layout.  Preliminary layout was shown

b.      Questions

                                                              i.      What will the cable path be?

                                                            ii.      Where will the oil tank go?

                                                          iii.      Walkway between 4-Pack and 8-Pack modulators?  5 feet is first guess.

                                                           iv.      How thick is the floor in ESB? –L. Erickson

c.      Need to verify ESB drawing.  – M. Ofengender

2)     Responsibilities and Gaps

a.      Should post McKee’s requirements chart on web.

b.      Bring requirements and specification questions for next meeting.

c.      Bring a list of you long lead items for next meeting.