The NLC 8-Pack Project Modulator Move Photos

 

Click on the links below to view photos:

1) The 4-dog modulator leaves the building. 

2) The 4-dog stand without the modulator. 

3) The modulator outside building 15. 

4) The modulator on its way to End Station B. 

5) The modulator approaches the End Station. 

6) The modulator fitting through the End Station door. 

7) The modulator inside ESB, ready to be lifted by the crane. 

8) The modulator lifted on the crane, rising above NLCTA. 

9) The modulator flying through ESB. 

10) The modulator sitting down, still on the 4-dog support, next to the 8-pack area. 

11) The modulator being finally lifted onto the 8-pack stand. 

 

The modulator which will power Phase 1 of the 8-Pack project has been installed on its stand. The modulator was moved from the 4-dog test stand where it was developed. The move and installation went very smoothly.


Main / Configuration / Drawings / Talks & Reviews 
Meeting Minutes  / Project Schd.  / Cost & Schedule/ Meeting Calendar

| SLAC Detailed Page | NLC Technical Home Page | Page Last Updated On  08/05/02.

This page was updated on August 05, 2002 by Nixx