The modulator which will power Phase 1 of the 8-Pack project has been installed on its stand. The modulator was moved from the 4-dog test stand where it was developed. The move and installation went very smoothly.
| SLAC Detailed Page | NLC Technical Home Page | Page Last Updated On 08/05/02.
This page was updated on August 05, 2002 by Nixx