
NLC Technical Page
Meeting
Schedule
SLAC Home Page
- NLC Collaboration Meeting (SLAC)
- January 31 - February 2, 2000
Abstract
The goals for this U.S. NLC Collaboration meeting
include review of the status of NLC accelerator physics, design, and technology, and
formulation of plans for future developments. A specific goal of this meeting is
finalization of detailed work plans and packages for the remainder of FY00 and definition
of milestones for the continuation of work through FY01.
MONDAY
Plenary Sessions [0900 - 1200]
Working Group Break-Outs (permanent magnets)
[1330-1700]
1. Discuss activities leading to September review[1330-1430]
- Present CDR 0.4 milestonesA. Ringwall
- Develop rough plans and milestones for PM'sAll
2. Prototype design discussion[1430-1630]
- Discuss comments from reviewsAll
- Magnetic design issuesAll
- Mechanical design issuesAll
- Build this design variant as prototype?All
- Resources, schedule for prototypeAll
3. Prepare progress report[1630-1700]
TUESDAY
Progress and Plans from Working Groups [0900 - 1000]
Working Group Break-Outs(permanent magnets)
[1000-1700]
- 1. Prototype design discussion(con't)[1000-1030]
- 2. Beam physics requirements for injector, damping
rings[1030-1200]
- Magnet candidates and requirements for injectorM. Schulze, J.
Sheppard, N. Phinney, P. Emma
- Magnet candidates and requirements for damping ringsM. Ross,
P. Emma, N. Phinney
- DiscussionAll
- 3. Lunch[1200-1300]
- 4. Beam physics requirements/issues for DR(con't), beam
delivery[1300-1400]
- Magnet candidates and requirements for DR(con't)M. Ross, P.
Emma, N. Phinney
- Magnet candidates and requirements for beam deliveryA.
Ringwall, T. Markiewicz
- DiscussionAll
5. Alternate PM materials, alternate designs[1400-1530]
- Other PM material options, cost vs. performanceAll
- Other PM variants: rotating designs, shunts, trim coilsAll
- Develop another variant? Which?All
6. Cost [1530-1700]
- PM material costs, sizes, etcAll
- Parts lists for dipole, quad, sextupoleAll
- Controls, facilities needs/costsAll + controls, facilities
- Parametric cost estimatingAll
WEDNEDAY
Working Group Break-Outs(permanent magnets)
(0900-1200)
- Finalize plans and milestones for '00[0900-1000]All
- Prepare for close-out[1000-1200]All
- Lunch[1200-1300]
Reports from Working Groups and Close-Out (1300 -
1500)
This page created on
01/06/2000 and updated on August 28, 2000 by Nixx.
[Disclaimers, Copyright, and
Other Fine Print]