
NLC Technical Page Meeting Schedule SLAC Home Page
CD 0.4 Goals
The goals for NLC CD 0.4 Costing Workshop are to review and further develop the technical definition and cost estimation of the NLC CD 0.4 Model. This includes examination of the completeness of definitions for machine and technical systems, development of the WBS with its underlying base of activities and resources, and initial estimates of the costs of the resources that would be required to build the NLC in the CD 0.4 Model. Emphasis will be on the completeness of the Model, the methodologies used to make cost, risk, and contingency estimates, and the roles and responsibilities of the cost estimating groups. Estimates should be given for all costs, but validation of the accuracy of these estimates is not the focus of this Workshop. The format will be plenary, and organizers should plan about a quarter of the scheduled time as discussion.
Costing Workshop: April 24 - 27, 2000
CD 0.4 Sections:
- Accelerator Parameters
- Injector Systems (with Damping Ring)
- Main Linac
- Beam Delivery
- Technical & Global Systems
- Conventional Facilities
- Configuration Changes Resulting from "Brain Storming" Process
- Revisions to Initial Configuration (03/29/00 Rev.2)
- NLC Model Schedule (for planning purposes only)
This page was created on
04/11/2000
and updated on October 02, 2002 by Nixx.
[Disclaimers, Copyright, and
Other Fine Print]