What's new
Broadband Seismometer Workshop, Lake Tahoe, California, March 24-26, 2004.
Our brief summary
8th International Workshop On Accelerator Alignment
4-7 October 2004, CERN - Geneva
Links
The CLIC Stability Study
Collection
of Papers on Ground Motion,
Ground
Motion Modeling (Updated Jan 29, 2002).
Slow tunnel
drift measurements at FNAL
Events
26th ICFA Advanced Beam
Dynamics Workshop:
Nanometre-Size Colliding Beams, 2-6 September 2002, Lausanne,
Switzerland.
The 22nd
Advanced ICFA Beam Dynamics Workshop on Ground Motion in Future Accelerators
November 6 - 9, 2000, SLAC
Snowmass 2001 Working
group on environmental control (tunneling, ground motion, stabilization,
etc.)
Sensors EXPO -
Fall 2001, Philadelphia, October 1-4, 2001
7th
International Workshop on Accelerator Alignment, November 5-8, 2001,
SPring-8
(postponed)
72nd Shock and Vibration
Symposium, November 12-16, 2001, Destin, FL
LC02 Workshop. SLAC,
Feb 4-8, 2002
Tech Links
Seismic
Sensors and their Calibration, Erhard Wielandt
Virtual Geotech
Civil Engineer
Geotechnical
Engineering discussion lists
Practical
Rock Engineering, 2000 Edition by Dr. E Hoek Online book
Military
Handbook, 1007/3, Soil Dynamics and Special Design Aspects , 15 November
1997
On-line discussion
forum on shock and vibrations
Journal on Smart
Materials and Structures Journal
of Vibration and Acoustics
10th International
Symposium on Deformation Measurements
Working meeting notes
June 14, 2000
(plans, etc...)
June 28, 2000
(plans, etc...)
July 19, 2000
(hardware for inertial stabilization...)
August 23, 2000
September 20, 2000
(review of inertial stabilization...)
October 11, 2000
(status of stabilization R&D, at SLAC and UBC...)
October 18, 2000
(discussion toward the GM2000 workshop...)
November 15, 2000
(status of stabilization R&D, FD in detector field...)
November 29, 2000
(FD in detector field...)
January 17, 2001
(review of inertial stabilization...)
February 28, 2001
(requirements to CF equipment...)
March 21, 2001
(status of stabilization R&D, at SLAC and UBC...)
April 18, 2001
(FD in detector field, HLS development...)
August 8, 2001
(vibration of RF structure...)
September 12, 2001
(inertial probe R&D, ground motion at NLC site 127...)
September 19, 2001
(feedback optimization for inertial stabilization...)
October 3, 2001
(Optical Anchor R&R at UBC)
October 10, 2001
(EXPO 2001 Sensors; NLC site 135)
October 31, 2001
(CERN-SLAC work; update on Optical Anchor)
November 7, 2001
(turbulent water induced vibrations)
December 5, 2001
(Stability drivers, part I; HLS status)
December 12, 2001
(Stability drivers, part II)
January 30, 2002
(flow induced vibration in RF structure)
February 13, 2002 (flow induced vibration in RF structure, theory and measurements )
April 24, 2002 (stabilization
status, two tunnel proposal, IP prototype)
Collaboration
mtg. and MAC
mtg. at FNAL, May 2002
ISG-8
mtg at SLAC, June 2002
July 10, 2002 (Fast
intratrain feedback)
March 13, 2003 Seminar on
BINP-FNAL-SLAC slow motion studies
March 28, 2003 Seminar by
Wilhelm Bialowons (DESY) on preliminary results of seismic studies performed all over the world.
July, 2003 Status of girder
stability studies at Fermilab.