3d_SLAC-smaller.gif (11599 bytes)

Ground Motion; Site Requirements and Investigations (WG5)
June  24 - 27, 2002

Bldg.281 Conventional Facilities Rm.

(A. Seryi, T. Tauchi)

Parallel Sessions:

Working Groups:

WG1: Parameters, Design, Instrumentation and Tuning
 
WG2: Damping Rings and ATF
 
WG3: RF Sources
 
WG4:Structures
 
WG5: Ground Motion; Site Requirements and Investigations

Agenda, ISG8 WG5 
Final Version

 

        Goal:
The main goal is to try to establish requirements to a linear collider site and determine a set of criteria that would allow evaluating a particular site.

 

           Trip to California representative sites:
Scheduled and happened on Friday, departure 6am. This was a full day event.   (Fred Asiri and Jerry Aarons were the guides).

 

Monday, June 24, 11:00-12:00

  • Initial discussion

Monday (joint with WG1)  13:30-17:30,  Bldg.212, Cascades room

Tuesday,  June 25, 9:30-12:00

Tuesday  13:30-17:30

  • Ground Motion Study at SLAC and FNAL, status and plans, 
    site requirements
    , Andrei Seryi 
    13:30-14:00
  • Essentials of Japan Site studies and requirements, Toshiaki Tauchi  14:00-14:30
  • Discussion on Site Criteria    14:30-15:00
  • Coffee    15:00-15:30
  • Cost evaluation and Conventional Facilities, Atsushi Enomoto    15:30-16:00
  • Cost evaluation and Conventional Facilities, Vic Kuchler     16:00-16:30
  • Discussion

 

Wednesday, June 26

Thursday, June 27, 9:00-12:00

  • Report preparation

Thursday, afternoon

 

 

NLC Technical Page     Meeting Schedule      SLAC Home Page 

This page created on 03/17/2002 by Nixx and updated on July 08, 2002 by A.Seryi.
[Disclaimers, Copyright, and Other Fine Print]