- Welcome - J. Dorfan - Orange Room
- ISG5 Goals & Information - D. Burke
- Status of ISG Report & Writing Tasks - N. Toge
- Strategy of Structure Development - N. Toge
- Past Experiences for DDS1
- Fabrication of RDDS1 Discs prior to Diamond Turning - Higashi
- Comment: Diamond Turning for RDDS1 - Higo
- Diamond Turning of RDDS1 Disks - Takatomi
- Comment: Necessity of CMM Measurement - Higo
- CMM Based Dimension Measurement of RDDS1 Disks - Waternabe
- RF QC Issues based on RDDS1 Experience - Higo
- Requirements on Frequencies of RDDS1- Higo
- Brief Summary: Stacking & Bonding of RDDS1 - Higo
- Evaluation of Diffusion-Bonded Junctions of DDS3D2 - Tsuchiya
Mass Production Issues
- Issues of Mass Production of RDDS - Higashi
- SBIR Review - RJ
- Structure Mass Production & Cost Estimation - JC
- Joint Session: WG1 Parameters
- Influence of Post-Bonding Errors of Fabrication: RDDS1 Wakefield - R. Jones
- RDDS1 Support
- Tolerances - RJ
- F1 Distribution - RJ
- MDS - ZL
- Recent Brain-Storm Issues - TR, CA
- Variation in future RDDS Cavities & Low Q Issues - ZL, RJ
- Joint Session: ISG Report Editors
- Ongoing Structure Working Group (RDDS1 and others)
- Pics
- Estimation for deformed Cells
- Progress / Plans - Reports - Orange Room
- Next Structure Issues (RDDS2 and near future programs)
- Design Issues:
- Input Coupler Design Field reduction & Symmetry (NK)
- Output End Modification
- Microwave QC Issues (VD & others)
- Eliminating Excess Surface Fields in the Imput Coupler - N. Kroll
- Discussion About Single Disk Quaility Control - V. Dolgashev
- Fabrication Issues
- Partitions between SLAC & KEK
- One or Two Sections in one batch
- Rough Time Table
- Round Table Discussion at MML in Stanford Campus
- Plenary Summary Preparation
- Close-Out Summary - Orange Room
NLC Technical Page Meeting Schedule SLAC Home Page
This page created on
02/03/2000 and updated on August 28, 2000 by Nixx.