3rd SLAC-KEK
International Linear Collider Study Group Meeting
January 25-28, 1999

Work Group 2

ISG3 Meeting Goals and Plans

The overall goal of the Third SLAC-KEK ISG meeting is to review the progress of each working group and to make specific plans for future work. The ISG will publish a progress report by the end of the 1999 calendar year. A specific task for this meeting is to create an outline of this progress report and to agree on the detailed design and R&D goals to be achieved in time for its preparation.

Compare and contrast JLC and NLC beam parameter specifications; highlight and understand differences. Discuss main damping ring and predamping ring lattice designs; compare and contrast differences between JLC and NLC designs. Discuss NLC damping ring development programs. Discuss beam loading compensation in the injector linacs, capture regions, and compressor sections of the JLC and NLC. Meet with the JLC/NLC Parameters Group.


Monday: 10:15 AM
Monday: 1:30 PM
  • Layout of the NLC Injector System: Sheppard
  • JLC/NLC Injector Beam Parameters: Hayano, Schultz, Sheppard
  • Breakout Discussion on Report: Hayano, Ross, Schultz, Sheppard
Tuesday: 10:00 AM
  • DR/PreDR Introduction: Ross
Tuesday : 1:30 PM
  • PM NLC DR RF Cavities: Rimmer
  • NLC DR Wigglers: Marks
  • NLC DR Kickers: Pappas
  • NLC DR Beam Loading: Tighe
  • Laser Wire in ATF-DR/JLC-DR: Sakai
Wednesday:10:00 AM
  • Beam Loading Compensation: Kashiwagi
  • Beam Loading Compensation: Li
  • Breakout Discussion on Report: Hayano, Ross, Schultz, Sheppard
  • JLC DR/PreDR Design: Kuroda
  • NLC DR/PreDR Design: Emma
Wednesday: 1:30
  • Joint Session with Parameters Working Group
  • Charge Requirements: Raubenheimer
  • Beam Loading JLC/NLC: Kashiwagi/Li
  • S-Band/L-Band Tolerances: Li
  • Bunch Compression NLC/JLC: Raubenheimer/ Yokoya
  • DR Lattice: Raubenheimer/Kuroda
Thursday: 9:00 AM
  • Summary Preparation: Hayano, Ross, Schultz, Sheppard
Thursday:1:30 PM