Summary:
Andrei Seryi: BDIR Work Plans
•
- The group discussed the work needed for ILC BDS design (see the attached
notes)
and general philosophy of the design and integrated international work.
- The most critical open issue is design for the 2mrad crossing angle IR.
This will start as soon as design of the 20mrad extraction, currently being
revisited by Yuri Nosochkov, will be finished.
- In the preparation to ATF2 proposal development, Alex Brachmann started
to look into possibility of using the Shintake style beam size monitor for
ATF2. First impression look positive, the laser technology is now more
advanced which is helpful. This evaluation will continue.
Yuri Nosochkov: 20mrad extraction line
- The 20mrad extraction is currently being revisited to optimize post IP
diagnostics. The status of the design for 20mrad x-ing is shown in Yuri's
slide.
Tom Markiewicz,
11/30/04