84 |
9/27/2009 |
SLAC Electron Cloud R&D Meeting |
Other
LARP - Markiewicz
ESA - Woods HA Components and Controls - Larsen
Availability modelling - Himel |
|
79 |
9/17/2009 |
US Positron Source R&D |
November 7 - Other
LARP - Markiewicz
ESA - Woods
HA Components and Controls - Larsen
Availability modelling - Himel |
|
80 |
9/17/2009 |
US Positron Source R&D |
SLAC LARP Phase II Collimation |
|
78 |
9/17/2009 |
SLAC Electron Cloud R&D Meeting |
Sources
e- source design - Brachmann
e- source R&D - Brachmann
e+ source design - Sheppard,Bharadwaj
E166 - Sheppard
target R&D - Gronberg
NC structures - Juwen Wang |
|
82 |
9/17/2009 |
US Positron Source R&D |
Report October 24 - Sources
e- source design - Brachmann
e- source R&D - Brachmann
e+ source design - Sheppard,Bharadwaj
E166 - Sheppard
target R&D - Gronberg
NC structures - Juwen Wang |
|
81 |
9/17/2009 |
SLAC Electron Cloud R&D Meeting |
Other
LARP - Markiewicz
ESA - Woods
HA Components and Controls - Larsen
Availability modelling - Himel |
|
83 |
9/17/2009 |
SLAC LARP Phase II Collimation |
Recover momentum after Snowmass break.
Eric Doyle presents developments in mechanical design. |
|
50 |
3/28/2006 |
Monthly LARP Collimator Video Meeting |
T. Markiewicz: Summary of 12/15/05 RC1 Review
australian
|
|
49 |
2/13/2006 |
SLAC ILC R&D Progress Report |
Other
LARP - Markiewicz
ESA - Woods
HA Components and Controls - Larsen
Availability modelling - Himel
|
|
47 |
1/30/2006 |
SLAC ILC R&D Progress Report |
Complete, objective information on World travel, including photos and reviews. Add your own wiki-style contributions. |
|
46 |
1/23/2006 |
SLAC ILC R&D Progress Report |
Legal gambling design
e- source design - Brachmann
e- source R&D - Brachmann
e+ source design - Sheppard,Bharadwaj
E166 - Sheppard |
|
45 |
1/9/2006 |
SLAC ILC R&D Progress Report |
Linac R&D
SMTF & Coupler R&D - Adolphsen
L-Band RF in ESB - Adolphsen
SC Quad R&D - Adolphsen
Marx Modulator - Leyh
MarryMaterials studies - Tantawi
|
|
43 |
12/19/2005 |
SLAC ILC R&D Progress Report |
Other
LARP - Markiewicz
ESA - Woods
HA Components and Controls - Larsen
Availability modelling - Himel
|
|
40 |
12/15/2005 |
LARP RC1 Prototype Conceptual Design Review |
Agenda
0900-0910 Tor Raubenheimer - Welcome & Charge to Committee
0910-1000 Tom Markiewicz - Project Overview (30"+20")
1000-1030 Ralph Assmann - CERN comments on collimation system requirements, the RC1 design and prototype plan, and CERN plans for Phase II collimator design (20"+10")
1030-1050 Lew Keller - Energy Deposition Studies (15"+5")
1050-1110 Coffee Break
1110-1130 Yunhai Cai - Collimator Efficiency Studies (15"+5")
1130-1230 Eric Doyle - Prototype Engineering Studies (30"+30")
1230-1330 Working Lunch with Discussion at
1330-1400 Eric Doyle - RC1 Construction & Test Plan (15"+15")
1400-1430 All - Discussion
1430-1530 Committee - Assemble Report Notes Committee - Closeout
1600 Adjourn
|
|
42 |
12/12/2005 |
SLAC ILC R&D Progress Report |
LET, BDS and CF
BC and Linac design - PT
BDS Design - Seryi
Conventional Facilities - Asiri,Corvin
|
|
41 |
11/28/2005 |
SLAC ILC R&D Progress Report |
Sources
e- source design - Brachmann
e- source R&D - Brachmann
e+ source design - Sheppard,Bharadwaj
E166 - Sheppard
target R&D - Gronberg
NC structures - Juwen Wang
|
|
39 |
11/21/2005 |
SLAC ILC R&D Progress Report |
November 21 - Damping rings
DR design - Cai, Wolski
e- cloud and ions - Pivi
ATF kicker and BPM R&D - Ross,et al
TTF HOM readout - Ross
|
|
38 |
11/14/2005 |
SLAC ILC R&D Progress Report |
November 14 - Linac R&D
SMTF & Coupler R&D - Adolphsen
L-Band RF in ESB - Adolphsen
SC Quad R&D - Adolphsen
Marx Modulator - Leyh
CF Layout for Modulator - Corvin
Materials studies - Tantawi
|
|
37 |
11/7/2005 |
SLAC ILC R&D Progress Report |
November 7 - Other
LARP - Markiewicz
ESA - Woods
HA Components and Controls - Larsen
Availability modelling - Himel
|
|
36 |
10/31/2005 |
SLAC ILC R&D Progress Report |
October 31 - LET, BDS and CF
BDS Design
|
|
35 |
10/24/2005 |
SLAC ILC R&D Progress Report |
October 24 - Sources
e- source design - Brachmann
e- source R&D - Brachmann
e+ source design - Sheppard,Bharadwaj
E166 - Sheppard
target R&D - Gronberg
NC structures - Juwen Wang
|
|
34 |
10/17/2005 |
SLAC ILC R&D Progress Report - Detailed Map |
October 17 Map- Linac R&D
SMTF & Coupler R&D - Adolphsen
L-Band RF in ESB - Adolphsen
SC Quad R&D - Adolphsen
Map Modulator - Leyh
Materials studies - Tantawi
|
|
32 |
10/11/2005 |
Monthly LARP Collimator Video Meeting |
This meeting is being held primarily to discuss the RC1 prototype CDR. That is, the Rotatable Collimator Prototype #1 Conceptual Design Report. This report is currently in draft form. CERN and SLAC need to determine its final form before it is subject to an external review. The eternal review is a prerequisite to spending the funds required to contrusct the prototype. |
|
33 |
10/10/2005 |
SLAC ILC R&D Progress Report |
1.) Mauro Pivi - Electron Cloud R&D
2.) Marc Ross - ATF Studies:
- Kicker studies
- ATF ring BPMs
|
|
31 |
10/5/2005 |
LARP Collaboration Meeting |
This meeting held at Pheasant Run Resort near Fermilab
We record here the talks in the Collimation Section on 10/6/05 08:30-10:00 and the final summary talk.
|
|
30 |
9/19/2005 |
SLAC LARP Phase II Collimation |
Review of progress:
Doyle: Change to energy absorbed by secondary when primary collimator length changed from 20cm to 60m
|
|
29 |
9/12/2005 |
SLAC LARP Phase II Collimation |
Recover momentum after Snowmass break.
Eric Doyle presents developments in mechanical design.
|
|
28 |
8/1/2005 |
SLAC LARP Phase II Collimation |
Lew Keller: status of FLUKA runs with 60cm Carbon primaries
Eric Doyle: updates to the mechanical design
|
|
27 |
7/26/2005 |
SLAC LARP Phase II Collimation |
Review Eric Doyle design of RF fingers
Review status of "new" FLUKA at SLAC
Review status of SixTrack code at SLAC
Review progress towards a prototype CDR
|
|
25 |
7/11/2005 |
SLAC LARP Phase II Collimation |
Eric Doyle, Tom Markiewicz & Andrei Seryi reviewed the summary notes from the June 15-17 visit of the CERN team. Eric prepared some slides relating to some of the engineering questions raised during that visit.
|
|
24 |
6/15/2005 |
SLAC/CERN LARP Phase II Collimator Collaboration Meeting |
Ralph Assmann - Collimation Project Status
Markus Brugger - Radiation protection constraints and design optimizations
Allesandro Bertarelli - Engineering constraints in the LHC; ANSYS results; Phase 1 mechanical movement by
Mario Santana Leitner - The FLUKA tools and results; Heat load on components
|
|
18 |
6/2/2005 |
LARP 2005 DOE Review |
0830 Responses & presentations, as requested
1030 BREAK
1045 Report writing
1200 LUNCH (eat-in)
1330 Executive session with LARP management
1400 Close-out
1430 ADJOURN
|
|
12 |
5/23/2005 |
SLAC ILC R&D Progress Report |
1.) Kathleen Ratcliffe: NLCTA Operations and Maintenance
2.) Marc Ross: ATF, TTF & PeP-II activities plus ATF Extraction Kicker
|
|
16 |
5/11/2005 |
US Positron Source R&D |
Positron Meeting
Wednesday May 11, 205 10:30AM SLAC B214 Fuji Room
Agenda
Tremaine: Parmela Work
Walston: GEANT4 Work
Miller/Sheppard: Drive Linac Discussion
Gronberg et al: The Document (see attachment and email below)
All: AOB
|
|
11 |
5/9/2005 |
SLAC ILC R&D Progress Report |
1.) Chris Adolphsen: NC Structure for ILC Positron Capture and ILC Linac SC Quad /BPM Evaluation
2.) Steffan Doebert: L-Band RF Power in End Station B
3.) John Cornuelle: ILC Klystron Status: Single Beam Klystrons
4.) Greg Leyh: MARX Modulator (submitted after the meeting)
5.) Ray Larsen: ILC FY2005 Electrical R&D Programs
|
|
22 |
5/2/2005 |
SLAC ILC Accelerator Design Meeting |
Parameters Tor Raubenheimer
e- source Axel Brachmann
e+ source John Sheppard
DRs Yunhai Cai/Andy Wolski
Availability Tom Himel
|
|
10 |
4/25/2005 |
SLAC ILC R&D Progress Report |
1.) Sami Tantawi: Advanced Concepts for ILC
2.) Kathleen Ratcliffe: NLCTA Operations and Maintenance
3.) Marc Ross: ATF, TTF & PeP-II activities plus ATF Extraction Kicker
4.) John Sheppard: ILC Positron Work: E166 & Positron Target
5.) Mike Woods: End Station A Experiments
|
|
54 |
2/3/2005 |
Monthly LARP Collimator Video Meeting |
1) Tom Markiewicz/SLAC: A short reminder of where we are and purpose of each study
2) Yunhai Cai/SLAC: Current status (& confusion) regarding Phase II efficiency studies
3) Lew Keller/SLAC (tentative): Some comments/questions on latest FLUKA
Current status of mechanical design of rotating collimator
5) Nikolai Mokhov/FNAL: Status of Fermilab effort