SLAC ILC R&D Progress Report-11/7/2005 (37)

1:30:00 PM-3:00:00 PM

 
Agenda: November 7 - Other
LARP - Markiewicz
ESA - Woods
HA Components and Controls - Larsen
Availability modelling - Himel
Summary: See summaries of individual talks.

2 .) id=112  Thomas Markiewicz --  Status of LHC Secondary Collimator Project  (20 min)

Summary: A conceptual design report for a rotatable copper seconday collimator that will fit within the LHC accelerator contraint envelope has been completed. In FY06 SLAC plans to build this collimator in two phases. In the first phase we will do thermal tests of one appropriately cooled jaw. In the second step we will build two jaws with full mechanical adjustments and test it in vacuum for accuracy.

2 .) id=111  Micheal Woods --  End Station A: Beam Delivery and IR Beam Tests  (20 min)

Summary: