SLAC/CERN LARP Phase II Collimator Collaboration Meeting-6/15/2005 (24)
9:30:00 AM-5:00:00 PM
| Agenda: |
Ralph Assmann - Collimation Project Status Markus Brugger - Radiation protection constraints and design optimizations Allesandro Bertarelli - Engineering constraints in the LHC; ANSYS results; Phase 1 mechanical movement by Mario Santana Leitner - The FLUKA tools and results; Heat load on components |
| Summary: |
Goal for this meeting: 1) Review and clearly define all LHC constraints to make sure that the SLAC phase 2 collimator prototype will fit into the LHC! 2) Review the technical details of the SLAC design and possibly provide input to your work. |
0 .) id=84 Thomas Markiewicz -- Summary Notes from Meeting (20 min)
| Summary: At the end of the meeting we tried to assemle a snapshot of - what we think the baseline design is - what items of the design need immediate work - what studies need to be expanded - action items and time scales See word document for details. |
1 .) id=75 Ralph Assmann -- Collimation Project Status (30 min)
| Summary: |
2 .) id=76 Thomas Markiewicz -- SLAC Phase II Collimator Status Summary (20 min)
| Summary: |
3 .) id=77 Eric Doyle -- SLAC Rotatable Collimator Engineering Design (30 min)
| Summary: |
4 .) id=78 Allesandro Bertarelli -- Engineering Constraints in the LHC (45 min)
| Summary: Including ANSYS results & Phase I mechanical movement. |
5 .) id=79 Lew Keller -- Collimator Energy deposition Studies at SLAC (30 min)
| Summary: |
6 .) id=80 Mario Santana Leitner -- FLUKA tools & results: Heat Load on Components (20 min)
| Summary: |
8 .) id=82 Markus Brugger -- Radiation Protection Constraints and Design Optimizations (20 min)
| Summary: |
9 .) id=83 Yunhai Cai -- Phase II Efficiency Calculations (20 min)
| Summary: |