Accelerator Development: Other Systems

Overview

 

Instrumentation and Controls - Global Group 2 Snowmass summary material

Early Priorities, Availability, MPS, Timing, Network Management, Post-Mortem, Data acquisition, Project relational database, Machine Detector interface (John Carwardine)

High Availability Architecture standard (Ray Larsen)

Machine Protection System (Marc Ross)

Diagnostic Interlock Layer (Ray Larsen)

Instrumentation Summary (Marc Ross)

Table of instrumentation (posted by Marc Ross)

Table of data flow parameters (Ferdie Willeke) and summarized sheet notes (Marc Ross) and related list (Manfred Wendt)

 

 

 

 

 

 

Back to Top | Home | Site Map | SLAC | NLC | NLC-Tech | SLAC Web Email |